12/24/12 | Meeting Canceled | |
12/17/12 | ||
2012-391 SW | Southwest Light Rail Transit Project (Green Line Extension): Award Professional Preliminary Engineering Consultant Contract (12P176) for the Southwest Light Rail Transit - Hopkins, St. Louis Park and Minneapolis link to SWLRT presentation | |
2012-392 SW | Southwest Light Rail Transit Project (Green Line Extension): Award Professional Prelmninary Engineering Consultant Contract (12P177) for the Southwest Light Rail Transit - Eden Prairie and Minnetonka link to SWLRT presentation | |
12/10/12 | ||
2012-373 | "A" Minor Arterial System Evaluation Study link to report | |
2012-370 SW | 2013-2016 TIP Amendment to add Midtown Greenway Corridor Bridge Study Project (SP#072-070-006: TAB Action 2012-39) | |
2012-371 SW | 2013-2016 TIP Amendment to add the Transportation Interchange facility in Minneapolis (SP#027-030-028; TAB Action 2012-37) | |
2012-372 SW | 2013-2016 TIP Amendment to Modify the Lake Street Access to I-35W Project (SP#027-603-049; TAB Action 2012-36) | |
2012-374 SW | Authorization to Enter into a Contract for Highway Transitway Corridor Study | |
2012-364 SW | Title VI Policies Authorization for Public Hearings | |
2012-368 SW | Authorization to Purchase Property - Public Facilities Maintenance Building | |
2012-387 SW | Extension CTIB Master Operations Funding Agreement for Transitway Service | |
Information | Central Corridor Light Rail Transit (Green Line): Construction Update 2012 and Look Ahead to 2013 | |
Information | Central Corridor Light Rail Transit (Green Line): SEIS Supplemental Environmental Impact Statement Update | |
Information | Downtown Saint Paul Facility Improvement Project | |
Information | 2012 Transportation Committee Work Plan Review link to 2012 TC Work Plan | |
11/26/12 | ||
2012-337 | Authorization to Purchase Eight Small Buses | |
2012-363 | Authorization to Amend Contract for Cedar Avenue BRT Express Services | |
2012-339 | Southwest Light Rail (Green Line Extension): Department of Employment and Economic Development (DEED) Grant Agreement | |
2012-332 SW | Central Corridor Light Rail Transit (Green Line): Subordinate Funding Agreement No. 8 with Minnesota Department of Transportation for 2013 Staffing | |
2012-338 SW | Southwest Light Rail (Green Line Extension): Subordinate Funding Agreement No. 2 with Minnesota Department of Transportation for 2013 Staffing | |
2012-344 | Blue Line: Authorization to Award Contract for Rail Grinding Services | |
2012-345 | Property Acquisition for the I-35E and County Road 14 Park-and-Ride Facility, Lino Lakes link to presentation | |
2012-351 | Transit Easement Interagency Agreement, Southdale Mall, City of Edina link to presentation | |
2012-359 SW | 2012 Unified Capital Program Amendment | |
2012-360 | Accept 2012-2016 Regional Service Improvement Plan link to presentation, link to RSIP Report:
https://www.metrocouncil.org/planning/transportation/RSIPDraftNov2012.pdf |
|
2012-247 | Request to Change Target Fund Balance Policy (3-8) | |
2012-336 SW | Authorization to Execute a Purchase Agreement with New Flyer | |
Information | Report on Gateway Alternatives Analysis (AA) Study Recommended Alternatives link to presentation | |
Information | Metro Mobility Budget Management Strategies link to presentation | |
Information | MTS Quarterly Ridership Report: Link to presentation | |
Information | Central Corridor (Green Line) Light Rail Transit: Contingency Status link to presentation | |
Information | Title VI Policies and Analysis link to presentation | |
Information | Northstar's Ramsey Station Update link to presentation | |
11/12/12 | Agenda | Meeting Canceled |
10/22/12 | ||
Information | "A" Minor Arterial Study - Receive Comments from Committee Members | |
2012-331 | Authorization to Execute a Capital Grant Agreement with SouthWest Transit | |
2012-322 | Northstar Corridor Commuter Rail Supplemental Subordinate Funding Agreement with Sherburne County Regional Rail Authority | |
2012-323 | Central Corridor Transit Service Recommended Plan | |
2012-324 | Central Corridor Light Rail Transit (Green Line): AECOM Engineering Services Amendment and 2013 Authorization | |
2012-325 | Amend Interagency Agreement with Minnesota Department of Transportation to Fund Highway 36 and Rice Street Park & Ride Construction, Change Order Authorization | |
2012-328 | Authorization to Award Contract for Transit Vehicle Tire Lease and Service | |
2012-292 | 2012 Unified Capital Program Amendments | |
2012-291 | 2012 Unified Operating Budget Amendment | |
Information | Draft Environmental Impact Statement | |
Information | Minneapolis Public Schools Student Pass Program and Supplemental Service Update | |
Information | Highway/Transitway Corridor Study | |
10/08/12 | ||
2012-310 | Southwest Light Rail Transit (Green Line Exension): Phase I / Limited Phase II Environmental Site Assessment | |
Information | "A" Minor Arterial Study Findings and Recommendations Executive Summary Draft Final Report | |
Information | 2012-2018 Capital Budget and Capital Improvement Plan | |
09/24/12 | ||
2012-301 | Wheel Tire Center Idler Truck - Light Rail Vehicle | |
2012-302 | Authorization to Execute a Capital Grant Agreement with the City of Maple Grove | |
2012-288 | Maple Grove Opt-Out Service Agreement | |
2012-298 SW | Transportation Management Organizations (TMOs) 14-Month Subrecipient Agreements | |
2012-284 | Authorization to Award and Execute a Contract for St. Paul Suburban Area Transit Service | |
2012-299 | Authorization to Execute Agreement with Minnesota Valley Transit Authority (MVTA) for Apple Valley Layover Project | |
2012-300 | Adopt 2013 Unified Planning Work Program (UPWP) link to draft UPWP link to presentation | |
2012-304 | CTIB 2013 Project Grant Applications Consistency with the 2030 TPP | |
Information | Central Corridor Transit Service Study Recommended Plan link to Changes & Clarifications | |
Information | Central Corridor (Green Line) Light Rail Transit Quarterly Update | |
Information | Minneapolis St. Paul International Airport Environmental Assessment (MSP EA) | |
Information | "A" Minor Arterial Study Background | |
Information | ||
Information | Regional Solicitation Evaluation | |
09/10/12 | ||
2012-263 SW | 2012 Unified Capital Program Amendments | |
2012-281 | Authorization to Lease MCI Buses to St. Cloud Metropolitan Transit Commission | |
2012-282 | Dial-A-Ride Fare Collection Contract with Cubic Transportation Systems | |
2012-283 | Purchase Software Licenses and Project Support from Trapeze Group | |
2012-286 | Designate Cedar Avenue Bus Rapid Transit (Red Line) and I-35W South Bus Rapid Transit (Orange Line) Service Providers | |
2012-275 | Sole Source Agreement with ACT Traffic Solutions, Inc. | |
2012-279 SW | Cedar Avenue Bus Rapid Transit (Red Line): Construction of 140th Street and 147th Street Stations Project 35793 | |
Information | Corridors of Opportunity Quarterly Update | |
Information | Federal Transportation Authorization MAP-21 Briefing | |
08/27/12 | ||
2012-269 | Authorization to Purchase Property - Gateway Layover Facility | |
2012-265 | Controlled Access Approval for Construction of an Interchange at TH-36 and English Street in Ramsey County, Review #21016-6 | |
2012-266 | Controlled Access Approval for St. Croix River Crossing Project (S.P> 8214-114) in Washington County, Review #21015 | |
2012-267 | Controlled Access Approval for Construction of an Interchange at TH 169 and CH 69 in Shakopee, Scott County, Review #21010-1 | |
2012-268 | Approval of 2012 Unified Planning Work Program (UPWP) Amendment | |
2012-270 | 203-2016 Transportation Improvement Program for the Twin Cities Metropolitan Area link to 2013-2016 TIP link to Public Comment Report link to presentation |
|
Information | Quarterly Regional Ridership Report | |
Information | Metro Mobility Radio Communications | |
08/13/12 | ||
2012-249 | Authorization to Purchase Seven Buses | |
2012-255 | Authorization to Execute Contract Options with Gillig, Inc. | |
2012-254 | Authorization to Apply for Section 5311 Non-Urbanized Area Formula Program Funds (Resolution 2012-24) | |
2012-250 | Southwest Light Rail Transit Project (Green Line Extension): Professional Services Agreement with the City of Eden Prairie | |
2012-223 | 2012 Unified Operating Budget Amendment | |
2012-224 | 2012 Unified Capital Program Amendment | |
2012-252 | Authorization to Execute an Operating and Capital Grant Agreement with Minnesota Valley Transit Authority (MVTA) | |
2012-256 | 2013 Capital and Operating Grant Applications to Counties Transit Improvement Board (CTIB) | |
2012-248 | Central Corridor Light Rail Transit (Green Line): Fourth Street Areaway and Sidewalk Reconstruction Contract | |
2012-251 | Authorization to Purchase 45 Option Forty-foot Diesel Gillig Buses | |
Information | Regional Air Quality Attainment Status | |
Information | State Fair Preview | |
Information | Blue Line Operations & Maintenance Expansion Update | |
Information | Light Rail Vehicle Type 2 Procurement | |
Information | Northstar Fare Pilot Program Rollout | |
Information | Advanced Technology Hybrid Buses | |
07/23/12 | ||
2012-231 | Central Corridor Light Rail Transit (Green Line): Funding Agreement with the City of St. Paul for Traction Power Sub Station 12 | |
2012-232 | Central Corridor Light Rail (Green Line): Easement Agreement with the Port Authority of the City of St. Paul for Traction Power Sub Station 12 link to presentation | |
2012-236 SW | Tokens: Temporary Fare Change Clarification | |
Information | Commuter Challenge Results | |
Information | Metropolitan Council Recommended Comments on MnDOT Multimodal Plan | |
Information | Metro Area Freight Rail Presentation | |
Information | Special Counsel Report: Southwest LRT Engineering Services Consultant Contract Procurement | |
2012-234 SW | Southwest Light Rail Transit (Green Line Extension): Engineering Services Consultant Contract Procurement 11P173 | |
07/09/12 | ||
2012-210 SW | Construction Contract for Highway 36 and Rice Street Park-and-Ride | |
2012-211 | Minnesota GreenCorps link to presentation | |
2012-212 | Red Line Bus Rapid Transit Grant Agreement with Dakota County Regional Rail Authority | |
2012-218 | 147th Street Station Phase 2 Joint Powers Agreement with DCRRA and City of Apple Valley link to presentation | |
2012-213 SW | Hiawatha Light Rail Facility Expansion Project 64910 | |
2012-214 | Property Acquisition for the I-35E and County Road E Park-and-Ride, Vadnais Heights link to presentation link to presentation | |
2012-216 | Regional Transit System Fare Collection Contract with Cubic Transportation Systems link to presentation link to presentation | |
2012-217 | 2012 Unified Capital Program Amendments | |
Information | 2012 Transportation Operating Budget link to presentation | |
Information | Metro Mobility Radio Consultant Report link to presentation | |
06/25/12 | ||
2012-204 | Midtown Corridor Alternatives Analysis | |
2012-205 | Southwest Light Rail Transit (Green Line Extension): Environmental Impace Statement (EIS) Responsible Government Unit (RGU) Transfer | |
Information | MnDOT Multi Modal Plan | |
Information | ||
Information | Metro Mobility MESB Update | |
06/11/12 | ||
2012-185 | Transportation Planning and Programming Guide (TAB Action 2012-25) link to presentation / link to Guide | |
Information | Cedar Ave. Transitway Update link to presentation | |
2012-158 | Cedar Avenue Transitway Stage 1 Memorandum of Understanding | |
2012-159 | Designate DCRRA as the Cedar Avenue Transitway Stage 1 Lead Agency | |
2012-187 | Authorization to Amend Subrecipient Grant Agreement with Washington County Regional Rail Authority (WCRRA) | |
2012-179 | Southwest Light Rail Transit (Green Line Extension): Memoranda of Understanding with Canadian Pacific and BNSF Railways link to presentation | |
2012-182 | Southwest Light Rail Transit (Green Line Extension): Project Management Software | |
2012-180 | Central Corridor Light Rail Transit (Green Line): Additional Change Order Authority for Civil East Construction Contract link to presentation | |
2012-181 | Central Corridor Light Rail Transit (Green Line): Additional Change Order Authority for Civil West Construction Contract link to presentation | |
2012-186 | Northstar Commuter Rail Fare and Tokens: Temporary Fare Change link to presentation | |
2012-188 SW | Southwest Light Rail Transit (Green Line Extension): Authorization to Apply for Funds under the Business Development Capital Grants Program Administered by the Minnesota Department of Employment and Economic Development (Resolution 2012-10) | |
Information | MTS Quarterly Ridership Report (1st Quarter 2012) link to presentation | |
Information | Program of Projects Update link to presentation | |
Information | Urbanized Area Update link to presentation | |
Information | Metro Mobility MESB Update | |
Information | Regional Fare Policy Initiative link to presentation | |
06/04/12 Special Meeting |
||
2012-173 | 2012-2015 TIP Amendment Request to include St. Croix River Crossing Pre-Construction Work (TAB Action 2012-21) | |
2012-174 | 2012-2015 TIP Amendment Request to include projects selected by MnDOT to receive FTA 5310: Elderly and Persons with Disabilities Program Funds (TAB Action 2012-22) | |
2012-165 | Central Corridor Light Rail Transit (Green Line) 50% Constructed Contingency Commitment link to presentation | |
2012-176 | Southwest Light Rail Transit Project (Green Line Extension): Award Professional Engineering Services Consultant Contract link to presentation | |
2012-177 | The Interchange - Authorization to Negotiate and Execute Two Grant Agreements and One Master Cooperation and Funding Agreement link to presentation | |
2012-157 | 2012 Unified Capital Program Amendments | |
05/28/12 | Agenda | Meeting Canceled |
05/14/12 | ||
2012-99 | Authorization to Exercise MCI Contract Options | |
2012-100 | Authorization to Purchase 38 Small Buses | |
2012-152 | Central Corridor Transit Service Study Concept Plan link to presentation | |
2012-153 | Central Corridor Light Rail Transit (Green Line): Additional Change Order Authority for the Operations and Maintenance Facility Contract link to presentation | |
2012-154 | Authorization to Purchase 30 Option Forty-foot Diesel Gillig Busees | |
2012-155 | Blue Line (Hiawatha Corridor) Vehicular Traffic Improvements | |
2012-160 | Authorization to Purchase Property, to Declare a Portion of the Property as Excess, and to Sell the Excess Property link to presentation | |
Information | MnDOT/Metro Council Joint Planning Efforts link to presentation |
|
Information | Corridors of Opportunity Update | |
Information | MTS Quarterly Ridership Report - 1st Quarter 2012 | |
Information | Interchange Update | |
Information | Midtown Corridor Alternatives Analysis Update link to presentation | |
04/23/12 | ||
2012-135 | 2012-2015 TIP Amendment Request to reflect a change of scope and cost adjustment for City of Eagan SP#145-010-010: TH 149 Reconstruction from TH 55 to I-494 (TAB Action 2012-15) | |
2012-136 | 2012-2015 TIP Amendment Request to include 5 Rail Crossing Safety Projects (TAB Action 2012-16) | |
2012-137 | 2012-2015 TIP Amendment Request to Increase the Total Cost for SOP#138-010-018: TH 36 and English Street Interchange in Maplewood (TAB Action 2012-17) | |
2012-134 | Central Corridor Transit Service Study Authorization for Public Hearings link to presentation | |
Information | Go-To System Overview link to presentation | |
Information | Light Rail Type I Overhaul Update link to presentation | |
Information | Tour of Downtown St. Paul Central Corridor Operations and Maintenance Facility | |
04/09/12 | ||
2012-116 | Authorization to Purchase Small Buses | |
2012-118 | Authorization to Purchase GFI Fare Collection Equipment | |
2012-111 | 2012-2015 TIP Amendment Request to Reflect a Change of Project Scope for Edina SP#120-020-037: France Avenue/72nd Street Pedestrian Bridge (TAB Action 2011-11) | |
2012-101 SW | Authorization to Award Contract for Bloomington & Roseville Area Transit Service | |
2012-107 | 2012 Unified Operating Budget Amendment | |
2012-108 | 2012 Unified Capital Program Amendment | |
2012-121 SW | Authorization to Award Contract for Gasoline Supplier | |
2012-117 | Authorization to Execute Grant Agreements with Minnesota Valley Transit Authority | |
2012-119 | Authorization to Amend Contract 11P032A for Permium Same Day and Peak Demand Overflow Service | |
Information | Bottineau Transitway Scoping Comments link to presentation | |
Information | Gateway Corridor Update link to presentation | |
3/26/12 | ||
2012-85 | Authorization to Execute Grant Agreement with the University of Minnesota | |
2012-103 | 2012-2015 TIP Amendment Request: MnDOT - Nice Ride Expansion at the St. Paul Capitol Complex and State Offices (TAB Action 2012-14) | |
2012-104 | 2012-2015 TIP Amendment Request: Lakeville SP#188-118--004 - Lake Marion Trail Extension and Right-of-Way Acquisition (TAB Action 2012-12) | |
2012-105 | Authorization to Execute Contract Options with Gillig | |
2012-102 SW | 2012-2015 TIP Amendment Request: Hennepin County - Transportation Interchange in Minneapolis (TAB Action 2012-13) | |
Information | Metropolitan Council Transit-Oriented Development (TOD) Strategic Action Plan | |
Information | Twins 2012 Promotional Campaign link to presentation | |
3/12/12 | ||
SW 2012-86 | Application to Host 2014 Rail-Volution Conference | |
SW 2012-84 | Central Corridor Light Rail Transit (Green Line): Subordinate Funding Agreement with University of Minnesota link to info | |
2012-87 | Southwest Light Rail Transit Project (Green Lines Extension): Master and Subordinate Funding Agreements with the Minnesota Department of Transportation link to info | |
Information | Mileage-Based User Fee Report link to presentation | |
Information | Minnetonka Transit Study Update link to presentation | |
Information | Solicitation for 2012 Competitive Federal Grants: State of Good Repair, Clean Fuels, Bus Livability link to presentation | |
2/27/12 | ||
2012-15 | Proposed Changes to Transportation Accessibility Advisory Committee (TAAC) Bylaws | |
2012-76 | 2012-2015 TIP Amendment: Request to add FTA Section 5307 foe I-35E and CR 14 Park and Ride in Lino Lakes (TAB Action 2012-09) | |
2012-77 | 2012-2015 TIP Amendment Request to add federal funds for I-35W westbound auxiliary lane, noise wall, and bridge replacement in Bloomington and Richfield (TAB Action 2012-10) | |
2012-75 | Authorization to Execute Contract Options with MCI | |
2012-73 | Authorization to Award Contract for Work Uniform Rental Program | |
2012-70 | Metro Mobility Agency Contract Recommendation | |
Information | Controlled Access Approval Overview Link to presentation | |
2012-71 | Controlled Access Approval for Construction of an Interchange at TH 169 and CSAH 30 (93rd Avenue) in Brooklyn Park | |
2012-72 | Controlled Access Approval for Construction of an Interchange at TH Hwy. 36 and Hilton Trail in Washington County | |
2012-78 | 2012-2015 TIP Amendment Request to Include SP_093-070-001: Procurement and Installation of 76 Electric Vehicle Charging Stations (TAB Action 2011-60) | |
Information | ||
Information | Energy Update for 2011 Link to presentation |
|
Information | Regional Service Improvement Plan Update Link to presentation | |
Information | MTS Ridership Report - year End/4th Quarter 2011 Link to presentation | |
Information | Performance-Based Planning Link to presentation | |
Information | Legislative Overview | |
2/13/12 | ||
2012-40 | Authorization to Enter into a Joint Powers Agreement with the State of Minnesota for Transit Link Service | |
2012-41 | Authorization to Execute Agreement with Verint Systems, Inc. | |
2012-44 | Central Corridor Light Rail Transit (Green Line): Subordinate Funding Agreement with the City of Minneapolis | |
2012-45 | Central Corridor Light Rail Transit (Green Line): Subordinate Funding Agreement with the City of St. Paul | |
2012-46 | Central Corridor Light Rail Transit (Green Line): Subordinate Funding Agreement with the Board of Water Commissioners of the City of Saint Paul | |
2012-54 | Adoption of Regional Transitway Guidelines | |
2012-56 | Acquire Property for the 140th and 147th Street Stations - Cedar Avenue BRT Project | |
2012-48 | Sustainability Policy for Internal Operations and Maintenance | |
2012-30 | Construction of the Maplewood Mall Park & Ride, Project 62911 Link to presentation | |
2012-47 | Central Corridor Light Rail Transit (Green Line): Amendment to the Subordinate Funding Agreement with University of Minnesota for Amundson Hall, Link to presentation | |
2012-43 | 2012 Unified Capital Program Amendments | |
2012-50 | Authorization to Contract for Design and Construction Support Services for the Overhaul Base Paint Booth and Renovations | |
2012-55 | Southwest Light Rail Transit (Green Line Extension): Cooperative Agreement with the Minnesota Department of Transportation | |
2012-12 | Adopt 2012 Transportation Committee Work Program | |
Information | MnDOT Guideway Status Report Link to presentation Link to report: https://www.dot.state.mn.us/govrel/reports/2012/Guideways%20Report%20final.pdf |
|
Information | American Public Transportation Association (APTA) Coach Bus Life Peer Review Report | |
Information | Central Corridor Light Rail Transit (Green Line): Lessons Learned Summary Link to presentation | |
Information | 2011 Annual Park-and-Ride Survey |
|
Information | Neighborhood Direct Mail Program Link to presentation | |
1/23/12 | ||
2012-26 | Central Corridor Light Rail Transit (Green Line): Business Marketing Contract (CCLRT presentation) | |
2012-27 | Central Corridor Light Rail Transit (Green Line): Authorization to Approve Contract Amendment for Environmental Testing and Monitoring During Construction | |
Information | Interchange Project Update | |
2012-28 | Minneapolis Interchange Project - Programmatic Agreement | |
2012-29 | Light Rail Transit/Bus Rapid Transit System Name and Identity Recommendations (presentation) | |
2012-30 | Construction of the Maplewood Mall Park and Ride, Project 62911 | |
2012-31 | Authorization to Execute a Capital Grant Agreement with SWT | |
2012-12 | Adopt 2012 Transportation Committee Work Program | |
Information | Transit Link Dial-a-Ride program Status | |
Information | Transitway Guidelines Comment Summary | |
1/09/12 | ||
2012-2 | 2012-2015 TIP Amendment Request for Hennepin County SP#072-619-019 CSAH 19/North Shore Drive over West Arm Channel bridge replacement in Orono (TAB Action 2011-68) | |
2012-3 | 2012-2015 TIP Amendment request to add MnDOT SP#1925-55: Preliminary Engineering for Managed Lane on TH 77 from 138th Street in Apple Valley to I-494 in Bloomington | |
2012-1 | Metropolitan Airports Commission (MAC) 2012-2018 Capital Improvement Program (CIP) TAB Action 2011-70) | |
2102-4 | Authorization to Amend Contract for Cedar Avenue BRT Services | |
2012-5 SW | Metropolitan Council Vanpoiol Service Re-Branding | |
2012-6 | Authorization to Execute Agreement with Cubic Transportation Systems for Fare Collection Software Support Services | |
Information | Northstar Commuter Rail: Updates for Ramsey Station and BNSF (Burlington Northern) Agreements | |
2012-7 | Northstar Commuter Rail: Authorization to Execute Agreements for Ramsey Station with Burlington Northern (BNSF) | |
2012-8 | Central Corridor Light Rail Transit (Green Line): Reimbursement to Minnesota Public Radio for Airborne Noise Mitigation | |
Information | Southwest Light Rail Transit Project Update | |
2012-9 | Southwest Light Rail Transit (Green Line Extension): Authorization to Execute Southwest Project Office Lease Agreement Between Metropolitan Council and Golub and Company/AEW Capital Management Partnership | |
2012-10 | Southwest Light Rail Transit (Green Line Extension): Authorization to Purchase Office Furniture and Information Technology Equipment for Southwest Project Office | |
2012-12 | Adopt Transportation Committee 2012 Work Plan | |
Information | Metro Mobility Hybrid Buses Update | |
Information | Arterial Transitway Corridors Study Update | |
Information | Central Corridor Light Rail Transit (Green Line): 2011 Construction Summary, Disadvantaged Business Enterprise (DBE)/Workforce Update | |
Information |
Reallocation of $20 million 2011 Transit Capital Improvement State G.O. Bonds |