RETURN TO COUNCIL MEETINGS

Transportation Committee - 2011 Agendas and Minutes

12/26/11 Agenda MEETING CANCELED
12/12/11

Agenda

Minutes

 
  2011-334 Blue Line (Hiawatha) Light Rail Vehicle Passenger Door Overhaul
  2011-353 Authorization to Exercise Contract Options with Motor Coach Industries
  2011-358 Central Corridor (Green Line) Light Rail: 2012 CTIB Counties Transit Improvement Board Capital Grant Agreement
  2011-359 Southwest (Green Line) Light Rail: 2012 Counties Transit Improvement Board Capital Grant Agreement
  2011-360 Authorization to Execute Agreements with the Counties Transit Improvement Board (CTIB) for Transit and Rail Operations
  2011-361 SW Discussion of Whether to Close Meeting Pursuant to Minnesota Statutes Section 13D.05, Subdivision 3(b), for Attorney-Client Privileged Discussion of a Proposed Settlement Agreement Relating to Threatened Litigation Regarding Employment Discrimination Claims
  Information Bottineau Transitway Update
  Information 2011-357:  Draft 2012 Transportation Committee Work Program
  Information LRT/BRT System Name and Graphics Update
  Information Central Corridor (Green Line) Light Rail Project Update
11/28/11

Agenda

Minutes

 
  2011-321 Authorization to Execute Grant Agreement with the City of Ramsey
  2011-322 Authorization to Execute a Grant Agreement with Minnesota Valley Transit Authority
  2011-335 2012-2015 TIP Amendment Request for Safe Routes to School Projects in Blaine, Fridley, Minnetonka and Burnsville (TAB Action 2011-67)
  2011-336 Procurement of Metro Mobility Buses in 2012
  2011-337 Authorization to Amend Contract for Gasoline Supply
  2011-343 Authority to Execute a Capital Grant Agreement with MVTA
  2011-329 Central Corridor Light Rail Transit (Green Line): Additional Contract Change Order Authority for the Operation and Maintenance Facility Contract
  2011-330 Central Corridor Light Rail Transit (Green Line): Approve Contract Amendment for AECOM
  2011-331 Central Corridor Light Rail Transit (Green Line): Subordinate Funding Agreement with the City of St. Paul
  2011-332 Central Corridor Light Rail Transit (Green Line): Initiate Eminent Domain Proceedings for the Acquisition of Parcel 7A (Greyhound) for Civil East Construction
  2011-333 Central Corridor Light Rail Transit (Green Line): Approve Art Designs for the Infill Stations
  2011-342 Central Corridor Light Rail Transit (Green Line): St. Paul Area Chamber of Commerce Amendment to Agreement for Services
  2011-339 2012-2015 TIP Amendment Requests for MVTA SP#TRS-MVTA-11: I-35W Transit Limited Express Service and Technology and for new Cedar Avenue BRT Station-to-Station Service (TAB Action 2011-65)
  Information Central Corridor Transit Service Study
  Information Bicycle & Pedestrian Planning
11/14/11

Agenda

Minutes

 
  2011-319 2012-2015 TIP Amendment Request from MnDOT for  Rail Crossing Safety Projects (TAB Action 2011-63)
  2011-303 Central Corridor Light Rail Transit (Green Line): Subordinate Funding Agreement No. 7 with Minnesota Department for 2012 Staffing
  2011-316 Northstar Commuter Rail Supplemental Subordinate Funding Agreement with Sherburne County Regional Rail Authority, SFY 2012
  2011-317 Authorization to Purchase Light Rail Vehicle Power Truck Brake Caliper Modification and Overhaul
  Information MTS Quarterly Ridership Repport
  Information Central Corridor (Green Line) Station Area Identity and Outreach
  Information Maplewood Mall Park and Ride Construction
  Information Ride to Rewards
10/24/11

Agenda

Minutes

 
  2011-284 Approval for Council Supplied Radio Equipment for New Light Rail Vehicles
  2011-293 Authorization to Contract for Design and Construction Support Services for Highway 610 and Noble Parkway Park-and-Ride
  2011-294 Interagency Agreement with Minnesota Department of Transportation to Fund Highway 36 and Rice Street Park-and-Ride Construction
  2011-285 Central Corridor Light Rail Transit (Green Line): Initiate Eminent Domain Proceedings for the Acquisition of Parcel 7E for Civil East Construction
  2011-258 2011 Unified Operating Budget Amendment
  2011-286 2011 Unified Capital Program Amendment
  2011-283 ADA and Transit Link Srvice Agreements with Scott and Anoka Counties
  Information Interchange Project Update
  information Metro Mobility Budget Projections
10/10/11

Agenda

Minutes

 
  2011-270 Authorization to Exercise Contract Options with Motor Coach Industries
  2011-262 Authorization to Purchase Light Rail Vehicle Level Sensor Replacements
  2011-274 Transportation Management Organizations (TMO) Subgrant Agreement Amendments for  2012
  2011-278 Design and Construction Support Services Contract Amendment for Maplewood Mall Transit Center Expansion
  2011-259 2011 Unified Capital Program Amendment
  2011-275 Authorization to Award Contract for the Council Subsidized Vanpool Program
  2011-277 Procurement of Metro Mobility Buses
  2011-280 CTIB 2012 Project Grant Applications Consistency with the 2030 TPP
  2011-266 Central Corridor Light Rail Transit (Green Line) and Blue Line (Hiawatha): Amendment to the Operation and Maintenance Agreement with Minnesota Department of Transportation for Bridges and Structures
  2011-272 Central Corridor Light Rail Transit (Green Line): Subordinate Funding Agreement with the Board of Water Commissioners of the City of St. Paul
  2011-273 Central Corridor Light Rail Transit (Green Line): Change Order with Walsh Construction for Segment Two Temporary Water
  Information Fall Advertising Campaign
9/26/11

Agenda

Minutes

 
  2011-265 2012 Unified Planning Work Program (UPWP), Authorization to File Grant Application (Resolution No. 2011-28)  Click here for Link to UPWP
  Information Tour of Metro Transit Bus Control Center
  information Regional Service Improvement Plan Status
  Information Arterial Transitway Corridors Study Update
  Information Transit Police Update and Initiatives
  Information Light Rail Transit/Bus Rapid Transit System Name Update
  Information 2012-2017 Capital Budget and Capital Improvement Plan
9/12/11

Agenda

Minutes

 
  2011-243 Authorization to Apply for  Section 5311 Non-Urbanized Area Formula Program Funds (Resolution 2011-26)
  2011-247 Authorization to Execute Agreements for Jobs Access and Reverse Commute (JARC) and New Freedom FFY 2010-2011 Program Funding
  2011-224 Authorization to Purchase Two Advanced Hybrid Drive Buses
  2011-239 Contract Award for Pocket Schedule Printing and Warehousing
  2011-246 Adopt 2012-2015 Transportation Improvement Program (TIP) Link to Draft TIP:  https://www.metrocouncil.org/planning/transportation/TIP/2012_2015_TIP/Draft2012_2015_TIP.pdf
  2011-236 Central Corridor Light Rail Transit (Green Line): Siemens Contract Amendment to the Light Rail Vehicle Contract to Allow 100% Performance Guarantee
  2011-237 Central Corridor Light Rail Transit (Green Line): Contingency Commitment
  2011-238 Blue Line (Hiawatha Light Rail Transit): Siemens Light Rail Vehicle Options
  2011-242 Central Corridor Light Rail Transit (Green Line): Initiate Eminent Domain Proceedings for the Acquisition of Parcel 64 (Prospect Park Properties Inc.) for Civil West Construction
  2011-241

Northstar Corridor, Ramsey Station - Authorization to Negotiate and Execute a Master Cooperation, Funding and Delegation Agreement

  2011-245 Authorization for City of Ramsey Transit Service Expansion Agreement
  2011-244 Northstar Corridor Commuter Rail Subordinate Funding Agreement with Sherburne County Regional Railroad Authority
  Information Metro Council/MnDOT/DHS Pilot Project with Scott/Carver County Smart Line
  Information MTS Quarterly Ridership Report
  Information Midtown Corridor Update
  Information Tour:  Bus Transit Control Center
8/22/11

Agenda

Minutes

 
  Information Central Corridor Light Rail Project Update
  2011-219 Central Corridor Light Rail Transit: Subordinate Funding Agreements with the City of Minneapolis
  2011-211 SW 2011-2014 TIP Amendment Request from Metropolitan Council for Central Corridor Light Rail Construction (TAB Action 2011-54)
  2011-205 2011 Unified Operating Budget Amendment
  2011-206 2011 Unified Capital Program Amendment
  2011-221 Authorizationto Purchase 41 Option 40-Foot Gillig Buses
  2011-234 Amendment of Business Item 2011-201, Northstar Locomotive Purchase
  2011-232 Authorization to Amend Supplemental Funding Grant Agreement with Minnesota Valley Transit Authority
  2011-220 Authorization to Execute Grant Agreement with Minnesota Valley Transit Authority for Cedar Avenue BRT Station Construction
  2011-233 Approval of the Draft Transitway Guidelines for Public Comment
  Information State Fair Update
  Information Northstar Update
  Information Midtown Corridor Update
  Information Electric Vehicles Plug-In Station Funding
8/08/11

Agenda

Minutes

 
  2011-212 2012 Capital and Operating Grant Applications to Counties Transit Improvement Board (CTIB)
  2011-213 $20 Million 2011 Transit Capital Improvement State G.O. Bonds Allocation
  2011-214 SW Defer Regional Transit Capital Local Match Commitment to Potential CMAQ Projects
  2011-207 Hiawatha Corridor Vehicular Traffic Improvements
  2011-210 Maple Plan Park and Ride Interagency Agreement with the City of Maple Plain
  Information Draft Regional Transitway Guidelines - Park 2
  Information Draft Transportation Improvement Program
  Information Congestion Mitigation Air Quality (CMAQ a) and FTA Grant Applications
  Information Transportation Division 2012 Operating Budget
7/25/11

Agenda

Minutes

 
  2011-200 Authorization to Execute Contract No. 11P002A, Diesel Fuel Supply REBID
  2011-199 Amendment to 2011 Unified Planning Work Program
  2011-201 SW Adopt Transportation Policy Plan Modification
  Information Commuter Challenge
  Information Legislative Summary and 2012 Budget Planning
  Information Draft Regional Transitway Guidelines - Park 2
  Information Met Council/MnDOT/DHS Pilot Project with Scott/Carver Transit Link
7/11/11

Agenda

Minutes

 
  2011-186 I-35W Transit / Access Project - Interagency Agreement with Hennepin County
  2011-188 Central Corridor Light Rail Transit: Initiate Eminent Domain Proceedings for Acquisition of Parcel 5Q (Central Presbyterian Church) for Civil East Construction
  Information Draft Regional Transitway Guidelines - Part 1
  Information Metro Transit Website Update
  Tour Metro Transit Heywood Facilities - Transit Information Center
6/27/11

Agenda

Minutes

 
  2011-176 2011-2014 TIP Amendment Request from MnDOT for TH 55 Full Depth Reclamation Project (TAB Action 2011-50)
  2011-177 Scope Change Request and 2011-2014 TIP Amendment for SouthWest Transit CR 10/TH 212 Park and Ride in Chaska (TAB Action 2011-51)
  2011-178 Scope Change Request and 2011-2014 TIP Amendment from MnDOt for TH 120/Hudson Road Intersection Improvement (TAB Action 2011-52)
  2011-181 Authorization to Execute a Grant with MVTA
  2011-185 Authorization to Execute Granst Agreement with SouthWest Transit
  2011-179 2011-2014 TIP Amendment form MnDOT for a Pre-Implementation Study for a Priced Managed Lane on I-94 between Downtown Minneapolis and Downtown St. Paul (TAB Action 2011-53)
  2011-180 Authorization to Execute Contract with Egan Company
  2011-149 Transitway Identity and Branding Framework Line Color Recommendations
  Information TAAC Representative -Ron Biss
  Information Draft Regional Transitway Guidelines - Part 1
  Information Planning for Potential Transit Budget Reductions
6/13/11

Agenda

Minutes

 
  2011-158 2011-2014 TIP Amendment and Program Year Change:  City of Maplewood SP#138-010-018: TH36 and English Street Interchange Construciton (TAB Action 2011-46)
  2011-159 2011-2014 TIP Amendment: MnDOT SP#6386-56: Unbonded Concrete Overlay, Reconstruction of Ramps and Loops and New Acceleration Lanes on I-694 at TH36 Interchange (TAB Action 2011-44)
  2011-165 Authorization to Amend a Grant Agreement with Minnesota Valley Transit Association
  2011-136 2011 Unified  Capital Program Amendment
  2011-166 Construction of Storage Tank Additions at FTHeywood and Nicollet Garages, Project 62710
  2011-163 Authorization for Public Hearings on Potential Service and Fare Adjustments
  Information Transitway Guidelines Overview
  Information Arterial Transitway Corridor Study Update
5/23/11

Agenda

Minutes

 
  2011-147 2011-2014 TIP Amendment: MnDOT Mill and Overlay on TH 52 in Inver Grove Heights
  2011-148 Authorization to Accept Federal 5311 Operating Funds from MnDOT
  2011-151 Procurement of Metro Mobility Buses
  2011-149 Transitways Identity and Branding Framework Line Color Recommendations
  2011-150 Authorization to Award Contract for Advertising Agency Services
  2011-143 Central Corridor Light Rail Transit Project: Cooperative Funding Agreement with the Minnesota Office of Enterprise Technology
  2011-144 Central Corridor Light Rail Transit Project: Subordinate Funding Agreement with the University of Minnesota
  2011-145 Central Corridor Light Rail Transit Project: Master and Subordinate Funding Agreement with Hennepin County
  2011-146 Central Corridor Light Rail Transit: Initiate Eminent Domain Proceedings for the Acquisition of parcel 1Q (BNSF Railway Company)
  Information I-35W Bus Rapid Transit
  Information Regional Fleet Policy/Procedures Overfiew
  Information Regional Transitway Guidelines Overview
5/09/11

Agenda

Minutes

 
  2011-121 SW 2011-2014 TIP Amendment: Metro Transit TIGGER II funded pilot project for two hybrid-drive buses
  2011-126 Metro Mobility Service Agreements SFY2011-2013
  2011-127 Amendments to ADA and Transit Link Dial-a-Ride Transit Service Agreements with Scott and Anoka Counties
  2011-128 Americans with Disabilities Act (ADA) DARTS Contract Amendment #2
  2011-124 Request for Approval of Central Corridor LRT Cash Flow Financing Plan
  2011-129 Highway 36 and Rice Street Park & Ride
  Information Transitways Identity and Branding Framework Line Color Recommendations
  Information MTS First Quarter 2011 Ridership Report
  Information Draft 2012-2015 Transportation Improvement Program (TIP)
4/25/11

Agenda

Minutes

 
  2011-116 Authorization to Execute Grant Agreements with Dakota County Regional Railroad Authority, City of Minneapolis, and Ramsey County Regional Railroad Authority
  2011-112 Authorization to Purchase 26 Option Forty-Foot Gillig Buses
  2011-113 SW Authorization for Public Hearings on Potential Service and Fare Adjustments (draft public hearing schedule)
  2011-115 Central Corridor Light Rail Transit: Fabrication and Installation of Public Artwork for 15 Central Corridor Light Rail Transit Stations
  2011-117 Authorization to Execute Grant Agreements with Ramsey County Regional Railroad Authority (relative to Union Depot)
  2011-114 2011 Regional Solicitation Approval (Regional Solicitation, Appendices, response to public comments)
  Information Hiawatha Light Rail Vehicle Overhaul Program Update
  Information Go Greener Overview
  Information Hybrid Bus Grant (Super Bus Program)
4/11/11

Agenda

Minutes

 
  2011-93 Rejection of Bids, Storage Tank Additions
  2011-94 Purchase of Passenger Waiting Shelters
  2011-96 Central Corridor Light Rail Transit: Amendment to the Cooperative Construction and Utility Relocation Agreement with the Board of Water commissioners of the City of St. Paul
  2011-97 Central Corridor Light Rail Transit: Subordinate Funding Agreements with the Board of Water Commissioners of the City of St. Paul
  2011-64 2011 Unified Operating Budget Amendment
  2011-65 2011 Unified Capital Program Amendment
  2011-95 Hiawatha Light Rail Facility Expansion
  2011-99 SW Central Corridor Light Rail Transit: Approval of Full Funding Grant Agreement with the Federal Transit Administration
  Information Central Corridor LRT Supplemental Environmental Assessment for Construction-Related Potential Impacts on Business Revenues
  Information Regional Solicitation Process
  Information Background Issues: Fare and Service Adjustments to Address Budget Shortfall
  Information 2010 Customer Survey Results
3/28/11

Agenda

Minutes

 
  2011-35 Approval of Transportation Committee 2011Work Plan
  2011-69 Software Support Services for Hiawatha Light Rail
  2011-73 SmartCoM Maintenance Agreement with Trapeze
  2011-78 Regional Automatic Vehicle Location (RAVL) System Interagency Agreements
  2011-87 Authorization to Amend Contract for Diesel Fuel Supply
  2011-82 2011-2014 TIP Amendment: Include Metro Transit FTA Section 5309 Funds for Real Time Transit Arrival Signs and Transit Signal Priority (TAB Action 2011-29)
  2011-83 2011-2014 TIPO Amendment: Metro Transit SP#CMT-09-07: Maplewood Mall Transit Center Expansion (TAB Action 2011-30)
  2011-84 2011-2014 TIP Amendment: Add Metro Transit FTA Section 5309 Funding for Construction of a New Paint Booth (TAB Action 2011-31)
  2011-85 2011-2014 TIP Amendment: FTA Section 5310 Projects for Transportation for Elderly and Persons with Disabilities (TAB Action 2011-32)
  2011-86 2011-2014 TIP Amendment: Dakota County SP#091-090-048: Mississippi River Trail from Cahill to Pine Bend Bluffs Trailhead (TAB Action 2011-33)
  2011-92 Rescission of Business Item 2010-302 and Authorization to exercise Contract Options with Motor Coach Industries
  Information

Park-and-Ride Survey Update

  Information Central Corridor Light Rail Project Overview
3/14/11

Agenda

Minutes

 
  Presentation Role of the Metropolitan Council in Transportation
  2011-35 2011 Transportation Committee Work Plan
  2011-8 Authorization to Exercise Contract Options with Gillig Corporation
  2011-9 Authorization to Exercise Contract Options with Motor Coach Industries
  2011-58 2011-2014 TIP Amendment Metro Transit: TIGGER II Section 5309 Funds to Install Geothermal Heating/Cooling System in O&M and Support Facility (TAB Action 2011-18)
  2011-59 2011-2014 TIP Amendment City of St. Paul SP#164-030-009: Planning for Saint Paul Complete Streets Policy (TAB Action 2011-19)
  2011-60 2011-2014 TIP Amendment MnDOT: SP#2750-75: Convert existing intersection to a folded diamond half interchange at TH 169 and 93rd Ave (TAB Action 2011-20)
  2011-61 2011-2014 TIP Amendment MnDOT  SP#2750-73: Install Cable Median Barrier on TH 169 north of 63rd Ave. to south of CSAH 81 in Brooklyn Park (TAB Action 2011-21)
  2011-63 Authorization to Award Contract for Armored Car Service
  Information 2010 Ridership Summary (MT)
02/28/11 Agenda Meeting Canceled
02/14/11

Agenda

Minutes

 
  2011-46 Authorization to Purchase Fareboxes
  2011-24 2011 Unified Capital Program Amendment
  2011-36 2011 Unified Operating Budget Amendment
  2011-47 Approval of Highway Bus Rapid Transit Station-to-Station Service Fare Collection Method
  2011-49 Authorization to Amend Contract to Comply with 2010 Environmental Protection Agency Emissions Regulations
  2011-50 Donated Buses Used for Hurricane Katrina Relief
  2011-39 Contract Change Order with Siemens for installing Automatic Passenger Counter Equipment on an additional 19 Light Rail Vehicles
  2011-51 Central Corridor Light Rail Transit: Additional Limited Notices to Proceed for April 2011
  2011-52 Central Corridor Light Rail Transit: Subordinate Funding Agreements with the City of Minneapolis
  2011-53 Central Corridor Light Rail Transit: Subordinate Funding Agreements with the City of St. Paul
  2011-54 Central Corridor Light Rail Transit: Subordinate Funding Agreements with the University of Minnesota
  Information Transit Facility Energy Conservation
01/31/11

Agenda

Minutes

 
  2011-25 Contract for Metro Transit Facilities Drain Cleaning and Disposal Services
  2011-27 Property Acquisition for Expansion of the Highway 610 and Noble Park and Ride
  2011-42 I-35W and Lake Street Interchange Interagency Agreement with Hennepin County
  2011-29 Central Corridor Light Rail Transit: Cooperative Funding Agreement with Qwest
  2011-30 Central Corridor Light Rail Transit: Initiate Eminent Domain on Parcel 9S (Midway Marketplace) for Civil East Construction
  2011-31 Central Corridor Light rail Transit: St. Paul Regional Water Temporary Water Change Order/Civil East
  2011-28 Transportation Management Organizations (TMOs) sub grant Agreement Amendments
  2011-41 2011 Unified Capital Program Amendment
  2011-32 2011-2014 TIP Amendment: Include MnDOT SP#8825-417: Repair Fiber Optic Cable (TAB Action 2011-7)
  2011-33 2011-2014 TIP Amendment: Include MnDOT SP2785-362: Nicollet Ave. Bridge Repairs (TAB Action 2011-8)
  2011-34 2011-2014 TIP Amendment: Add 11 County Preservation Projects which Utilize Additional Federal Funds in FFY 2011 (TAB Actions 2011-9, 10, 11, 12, 13, 14 & 15)
  Information Transitways Identity and Branding Framework Implementation Recommendations
 

Information

2011-35

2011 Transportation Committee Work Plan
01/24/11

Agenda

Minutes

 
  2011-25 Contract for Metro Transit Facilities Drain Cleaning and Disposal Services
  2011-27 Property Acquisition for Expansion of the Highway 610 & Noble park and Ride
  2011-42 I-35W and Lake Street Interchange Interagency Agreement with Hennepin County
  2011-29 Central Corridor Light Rail Transit: Cooperative Funding Agreement with Qwest
  2011-30 Central Corridor Light Rail Transit: Initiate Eminent Domain on Parcel 9S (Midway Marketplace) for Civil East Construction
  2011-31 Central Corridor Light Rail Transit: St. Paul Regional Water Temporary Water Change Order/Civil East
  2011-28 Transportation Management Organizations (TMOs) Subgrant Agreement Amendments
  2011-41 2011 Unified Capital Program Amendment
  2011-32 2011-2014 TIP Amendment: Include MnDOT SP#8825-417: Repair Fiber Optic Cables (TAB Action 2011-7)
  2011-33 2011-2014 TIP Amendment: Include MnDOT SP#2785-362: Nicollet Ave. Bridge repairs (TAB Action 2011-8)
  2011-34 2011-2014 TIP Amendment: Add 11 County Preservation Projects which Utilize Additional Federal Funds in FFY 2011 (TAB Actions 2011-9, 10, 11, 12, 13, 14, & 15)
  Information Discount Transit Passes Program: Eligible Charitable Organizations serving the Homless
  Information Transitways Identity and Branding Framework Implementation Recommendations
  Information Transitway Guidelines Next Steps
01/08/11

Agenda

Minutes

 
  2011-3 2011-2014 Transportation Improvement Program (TIP) amendment: Section 5307 Downtown Minneapolis East-West Transit Spine (TAB Action 2010-69)
  2011-4 SW 2011-2014 Transportation Improvement Program (TIP) amendment:  Mill and overlay and additional funds for HOT lane project on I-35 from I-35W/E intersection to Burnsville parkway (TAB Action 2010-70)
  2011-5 SW 2011-2014 Transportation Improvement Program (TIP) amendment: Unbonded Concrete overlay, drainage corrections, cable median barrier on I-35E from South of CSAH 96 to I-35W junction (TAB Action 2010-71)
  2011-6 SW 2011-2014 Transportation Improvement Program (TIP) amendment:  Mill and overlay on TH 8 from I-35 to CSAH 80 in Forest Lake and Chisago City (TAB Action 2010-72)
  2010-2 SW Authorization to Execute Agreements with the Counties Transit Improvement Board (CTIB) for Transit and Rail Operations
  2011-1 SW 2011 Metropolitan Airports Commission (MAC) Capital Improvement Program (CIP) Review
  2011-12 Approval of the 2010 Jobs Access Reverse Commute (JARC) and New Freedom Solicitation Project Recommendation
  2011-7 Council Subsidized Vanpool Program Changes
  2011-11 SW Construction Contract for FTHeywood Computer Room Upgrade
  2011-10 Energy Conservation Improvements at Three Garages
  Information 2010-298: Central Corridor Light Rail Transit: Initiate Eminent Domain Proceedings for the Acquisition of Parcel 5B (Hellervik Parking Lot) for Civil East construciton
  Information Central Corridor Light Rail Transit: Cash Flow
  Information Transportation Retrospective 2003-2010